[{"id":393616425210,"handle":"7-3-powerstroke-fuel-system","title":"7.3 Powerstroke Fuel System","updated_at":"2024-05-13T18:00:39-04:00","body_html":"","published_at":"2022-03-11T21:06:19-05:00","sort_order":"best-selling","template_suffix":null,"disjunctive":false,"rules":[{"column":"tag","relation":"equals","condition":"Engine_7.3 Powerstroke"},{"column":"tag","relation":"equals","condition":"Type_Fuel System"},{"column":"type","relation":"not_equals","condition":"mws_apo_generated"}],"published_scope":"web"},{"id":393609642234,"handle":"7-3-powerstroke-parts","title":"7.3 Powerstroke Parts","updated_at":"2024-05-16T10:45:15-04:00","body_html":"\u003ch2 data-mce-fragment=\"1\"\u003e\u003cstrong data-mce-fragment=\"1\"\u003eFully Equipped for Your Needs\u003c\/strong\u003e\u003c\/h2\u003e\n\u003cp data-mce-fragment=\"1\"\u003eThere’s no better place to turn when you’re looking for the most extensive range of 7.3 Powerstroke performance parts than right here. Powerhouse Diesel is committed to provide our customers with only the best, which is why we stock parts and accessories from the leading names in the business. Here you’ll find 7.3 Powerstroke performance upgrades and more from brands such as Mahle, Full Force, Motorcraft, KC Turbo and others. With such a vast range of options available under one roof, you’re sure to find the answer to your need. \u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003eWe’re your comprehensive source for everything related to the performance of your engine, from big to small. Our offerings range from connecting rod sets and fuel injectors all the way down to gaskets and sealants. Some examples of what we carry in our inventory include:\u003c\/p\u003e\n\u003cul data-mce-fragment=\"1\"\u003e\n\u003cli data-mce-fragment=\"1\"\u003eEngine components\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eFluids\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eFuel system parts\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eIntake and cooling components\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eSuspension and driveline systems\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eSteering parts\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eTransmissions\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eTuning equipment\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eTurbochargers\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eExhaust systems\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eAnd more\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 data-mce-fragment=\"1\"\u003e\u003cstrong data-mce-fragment=\"1\"\u003eKnow Before You Shop\u003c\/strong\u003e\u003c\/h2\u003e\n\u003cp data-mce-fragment=\"1\"\u003eWhenever shopping for aftermarket parts and accessories, it’s essential to understand exactly what kind of performance boost you want. There are a lot of options out there when it comes to 7.3 Powerstroke diesel parts, and not all of them provide the same specs. Are you looking to boost your truck’s raw power for towing? Do you want to get better fuel efficiency? Would you like to extend the lifespan of your engine? Or is it simply time for routine maintenance? Whatever reason you have for popping the hood, you want to make sure you get the right parts for the job.\u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003eThe experts here at Powerhouse Diesel know these engines inside and out, and we’re ready to help you find the components that will unlock your truck’s full potential. We’ll match you to the products that will provide you with exactly what you want. If you want to learn more about what we have in stock, browse through the listings on this page or reach out to speak with one of our representatives.\u003c\/p\u003e","published_at":"2022-03-11T15:23:28-05:00","sort_order":"best-selling","template_suffix":"","disjunctive":false,"rules":[{"column":"tag","relation":"equals","condition":"Engine_7.3 Powerstroke"},{"column":"type","relation":"not_equals","condition":"mws_apo_generated"}],"published_scope":"web"},{"id":393609543930,"handle":"powerstroke-parts","title":"Powerstroke Parts","updated_at":"2024-05-16T13:05:26-04:00","body_html":"\u003ch2\u003e\u003cstrong\u003eEverything We Have to Offer\u003c\/strong\u003e\u003c\/h2\u003e\n\u003cp\u003eIf you’re looking for the most comprehensive selection of Powerstroke performance parts found anywhere in the marketplace, look no further than Powerhouse Diesel. We stock a huge inventory of products from leading brands such as KC Turbo, Full Force, SPE Motorsport and more. Our selection means you’re sure to find something to meet your needs whether you have a 6.0, 6.4, 6.7 or 7.3 liter Powerstroke engine.\u003c\/p\u003e\n\u003cp\u003eThe extensive range of components we provide range all the way from full transmissions and turbos down to smaller items such as gaskets and fluids. Examples of what you’ll find here include:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFuel injectors\u003c\/li\u003e\n\u003cli\u003eFuel system parts\u003c\/li\u003e\n\u003cli\u003eIntake and cooling components\u003c\/li\u003e\n\u003cli\u003eSuspension and driveline systems\u003c\/li\u003e\n\u003cli\u003eSteering parts\u003c\/li\u003e\n\u003cli\u003eTransmissions\u003c\/li\u003e\n\u003cli\u003eTuning equipment\u003c\/li\u003e\n\u003cli\u003eFuel system contamination kits\u003c\/li\u003e\n\u003cli\u003eTurbochargers\u003c\/li\u003e\n\u003cli\u003eExhaust systems\u003c\/li\u003e\n\u003cli\u003eAnd more\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2\u003e\u003cstrong\u003eMaking the Right Call \u003c\/strong\u003e\u003c\/h2\u003e\n\u003cp\u003eBefore shopping for parts in our vast inventory, it’s important first to consider your needs. Determining what you want or need your diesel engine to do for you will help you narrow down your options. For example, maybe you want to get more raw power from it to help you tow a trailer for work or a boat on the weekends. If you’re concerned about your fuel consumption, you might want to invest in something that helps you get better mileage. Perhaps your main concern is extending the lifespan of your engine so you can gain peace of mind. Of course, there’s always routine maintenance that needs to be done, and having the right components will make the effort worthwhile.\u003c\/p\u003e\n\u003cp\u003eWhatever the case may be, know that the experts at Powerhouse Diesel are here to make sure you find what you need. We have deep know-how that extends to practically every aspect of Powerstroke engines. When you reach out to us, we’ll provide you the full benefit of our experience and expertise to match you with the parts that make the most sense for your vehicle and how you use it.\u003c\/p\u003e\n\u003cp\u003eTo learn more about everything we have to offer, browse through the full lineup of products on this page. Alternatively, you can get in touch with us and learn from one of our helpful and knowledgeable representatives. However you connect with us, we’re here for you.\u003c\/p\u003e","published_at":"2022-03-11T15:23:27-05:00","sort_order":"best-selling","template_suffix":"","disjunctive":true,"rules":[{"column":"tag","relation":"equals","condition":"Engine_7.3 Powerstroke"},{"column":"tag","relation":"equals","condition":"Engine_6.0 Powerstroke"},{"column":"tag","relation":"equals","condition":"Engine_6.4 Powerstroke"},{"column":"tag","relation":"equals","condition":"Engine_6.7 Powerstroke"}],"published_scope":"web"},{"id":398111867130,"handle":"all","title":"Products","updated_at":"2024-05-16T13:30:43-04:00","body_html":null,"published_at":"2022-06-01T14:49:35-04:00","sort_order":"alpha-asc","template_suffix":null,"disjunctive":false,"rules":[{"column":"type","relation":"not_equals","condition":"mws_apo_generated"}],"published_scope":"web"},{"id":411090714874,"handle":"xdp","title":"Xdp","updated_at":"2024-05-14T10:10:29-04:00","body_html":"","published_at":"2023-08-22T22:04:37-04:00","sort_order":"best-selling","template_suffix":null,"disjunctive":false,"rules":[{"column":"vendor","relation":"equals","condition":"Xdp"}],"published_scope":"web"}]
The Remanufactured 7.3L AE Fuel Injector XD475 will replace the damaged #8 Long Lead injector in your 1999.5-2003 Ford 7.3L Powerstroke. With years of manufacturing experience and over 30 million diesel fuel injectors produced to date, you can be sure you are getting a quality product.
By surpassing the manufacturers' current design specifications, these injectors have less than 0.2 percent warranty rate. Every injector is comprehensively tested for nozzle flow and needle lift as well as opening operation and leakage.
Additional tests include shot-to-shot flow meters, poppet seat leakage test, and injection timing measurements for best-in-class testing. Quality and Testing Advanced end-of-line testing, delivery, leakage and opening characteristics.
Precision remanufacturing process ensures highest quality, reliability and performance. Opening clearances are set to strict specifications; validated with engine and vehicle testing and compared to OE product.
Features:
Stock HP and Flow Rating
Best In Class End-Of-Line Testing Nozzles
Tested For Flow, Leakage and Needle Lift
In-Line Error Proofing Incorporated In Assembly Process